发布网友 发布时间:2022-04-24 13:58
共1个回答
热心网友 时间:2023-10-15 10:05
"Horse's hoofs form" part earthquake the is in really airtight to start construction key, exert a preparing of beam body dint a value of accuracy to prepare should the quality of dint beam go to pass importance, double control a method piece to pull at after the piece method prepare should the dint T beam under construction of applied technique and steel wring line elongation a value of calculation, prepare should blemish and prevention and cure of the dint T beam external appearance quality.