摘 要 通过对SVM1000型铺轨机组一次性铺设跨区间无缝线路施工过程中的应用分析,总结了SVM1000型铺轨机组“钢轨侧翻控制、钢轨接头快速准确对位、精确布枕减少匀枕”等施工技术,在设计与施跨区间无缝线路工等方面起到了指导作用。
Abstract:
After concting an analysis on the construction process of the application of paver set model SVM1000 for the one-time laying of trans-sectional seamless rails, it is concluded that the construction techniques of model SVM1000 in terms of rail overturning control, fast and accurate joining of rails, precise sleeper distribution and sleeper rection, etc. have played a guiding role in the aspects of design and laying work of trans-sectional seamless rails.
关键词 SVM1000型铺轨机组 铺设 无缝线路
Key words: Paver set Model SVM1000; track-laying; seamless rails.
摘 要 湘桂铁路柳南段、南广铁路南黎段高速铁路在南宁境内属四线并行铁路,通过对“跨四线提梁机配合移梁平台装梁施工技术”在施工过程中的应用分析,总结了跨四线提梁机提梁、轮轨式移梁平台移梁、提梁机配合移梁平台多种装梁方式等施工技术,在 箱梁、T梁架设施工中有广阔的应用的前景。
Abstract:
The high-speed railways of Liuzhou-Nanning segment of the Hunan to Guangxi Railway and the Nanning-Litang segment of the Nanning to Guangzhou railway in the Nanning region are both quadruple-track railways. By analyzing the application of the girder erection technique of using the straddle-four-track girder hoisting crane with the girder shifting platform, it is concluded that the various construction techniques, such as the application of straddle-four-track girder hoisting crane for hoisting girders, wheel rail type girder shifting platform for shifting girders, and the combination of crane and platform for girder erection, all have a wide range of application prospects in the erection of box girders and T girders.
关键词 跨四线提梁机 移梁平台
Key words: straddle-four-track girder hoisting crane; girder shifting platform;
装梁
girder erection.
中图分类号 文献标识码 文章编号
CLC Numbers; Document codes; Article ID
摘 要 TTYJ-900t穿隧式运架一体机能够穿过隧道运架900t铁路客运专线箱梁,运用该套设备在特殊工况箱梁架设过程中的成功经验,总结了穿隧式运架一体机“通过隧道运架箱梁、架设首末孔、桥间路基快速转场、隧道口零距离架梁”等特殊工况施工技术,在铁路客运专线设计与施工等方面起到了指导作用。
Abstract:
The TTYJ-900t tunneling typed transporting and erecting integrated machine can go through a tunnel, transport and erect the 900t box girders of the special railway lines for passengers. The successful application experience of this set of equipment on the special work conditions of the box girder erection has proven that this construction technique which involves the transporting and erecting of box girders through the tunnel, mounting at the first and last holes, the rapid transfer of bridge and subgrade, and zero distance girder erection at tunnel entrance, has played a guiding role in the aspects of design and construction of the special railway lines for passengers.
关键词 穿隧式运架一体机 特殊工况 架设900t及以下箱梁
Key words: tunneling typed transporting and erecting integrated machine; special work conditions; erection of box girders weighing 900t and below.
【英语牛人团】
热心网友
时间:2023-10-15 10:05
Abstract By laying the analysis of cross-CWR construction process, once SVM1000 paver set summarizes the construction the SVM1000 paver set rail rollover control, rail joints quickly and accurately on the bit accurate cloth pillow rece uniform pillow "the technology has played a guiding role in the design and construction aspects.
Keywords SVM1000 paver set laying CWR
Abstract Hunan, Guangxi the railway Liunan segment, the high-speed railway in South Canton Lunan Li segment Nanning territory is a four-wire parallel railway through "cross the four-wire Gantry Crane loading beam construction with shifting beams platform application analysis in the construction process, summed across four wire Gantry Crane beam lifting wheel-rail style shift beam platform shift beam Gantry Crane with shifting beam platform for a variety of loaded beams such as construction technology has broad application in the box beam, T beam erection prospects.
Keywords cross the four-wire Gantry Crane shift beam platform mounted beam
Abstract TTYJ-900t tunneling operation and frame one machine can be through the tunnel shipped frame 900t Railway Passenger Dedicated Lines, the successful experience of the use of the equipment box girder erection process in the special conditions, summarizes the tunneling operation and frame one machine through the tunnel operation and frame box girder erection of the first and last hole, the bridge roadbed fast transitions, the tunnel mouth up close girder special conditions construction technology played a guiding role in the design and construction of railway passenger line etc..
Keywords tunneling operation and frame one machine special conditions erecting 900t and the following box girder
热心网友
时间:2023-10-15 10:05
Pick to through the SVM1000 type track-laying unit one-time laid between interregional seamless line construction process of application analysis, summarizes the SVM1000 type track-laying unit "rail side turn control, rail joint rapid accurate para, accurate cloth pillow rece uniformly pillow" and so on the construction technology, in the design and construction aspects plays a guiding role. Keywords SVM1000 type track-laying unit laid seamless line pick to XiangGui railway willow southern south road, GuangTie li period of high-speed railway in nanning territory belong to four line parallel railway, through the "span four line with erecting machine move LiangPingTai loading beam construction technology" in the construction process of application analysis, summarizes the span four line girder erecting machine, LunGuiShi shift LiangPingTai shift beam, erecting machine LiangPingTai shift with a variety of loading � 我艹!你这太难了!
热心网友
时间:2023-10-15 10:06
以上的翻译全是google体。楼主你不如花钱去翻译了,会翻译这个的都不屑来逛这里。
热心网友
时间:2023-10-15 10:07
楼主,这个专业性很强呀,如果是业务上需要的你可以联系翻译公司哈,不然一般的人翻译出来质量都不高
热心网友
时间:2023-10-15 10:07
Pick to through the SVM1000 type track-laying unit one-time laid between interregional seamless line construction process of application analysis, summarizes the SVM1000 type track-laying unit "rail side turn control, rail joint rapid accurate para, accurate cloth pillow rece uniformly pillow" and so on the construction technology, in the design and construction aspects plays a guiding role.
Keywords SVM1000 type track-laying unit laid seamless line
Pick to XiangGui railway willow southern south road, GuangTie li period of high-speed railway in nanning territory belong to four line parallel railway, through the "span four line with erecting machine move LiangPingTai loading beam construction technology" in the construction process of application analysis, summarizes the span four line girder erecting machine, LunGuiShi shift LiangPingTai shift beam, erecting machine LiangPingTai shift with a variety of loading beam mode construction technology, in box girder, T beam erection has broad application prospects.
Keywords span four wire erecting machine shift LiangPingTai loading beam
Pick to TTYJ - 900 t tunneling type transport frame multifunction can pass through a tunnel luck frame 900 t railway passenger dedicated line box, use this set of equipment in the special conditions in the process of box girder erection successful experience, the author summarizes the tunneling type transport frame multifunction "through the tunnel luck frame box girders, set up at the end of the first hole, bridge and tunnel between roadbed fast ferry zero distance frame beam" and so on special condition construction technology, in the railway passenger dedicated line design and construction aspects plays a guiding role.
Keywords tunneling type transport frame multifunction special condition set up 900 t and the following box girder